Infrastructure · Utility
Utility Distribution & Underground Utilities
Underground duct bank, conduit, vaults and distribution networks that bring power to developments, campuses and public infrastructure.
Proud Union Electrical Contractor · Skilled union workforce

Before a building is energized, someone has to bring power to it. WITEC builds the underground electrical infrastructure — trenching coordination, duct bank, conduit, pull boxes, vaults and cable — that connects utility service to the projects that need it.
We also work on distribution networks for campuses and multi-building sites, coordinating with the serving utility on service points, equipment pads and outage scheduling.
Scope
What we install & service
Underground utilities
- Duct bank and conduit installation
- Pull boxes, handholes and vaults
- Cable pulling for low- and medium-voltage
- Transformer pads and service laterals
- Underground ductbanks and excavation
- Coordination of utility locates
Distribution networks
- Campus and multi-building distribution
- Utility service coordination
- Site electrical for developments
- Street lighting and signal infrastructure
- Highway and bridge electrical infrastructure
How we work
A clear, safe process
- 01
Plan & locate
Confirm existing utilities before digging.
- 02
Build
Install raceway to depth, slope and separation requirements.
- 03
Pull & terminate
Cable installed with proper tension and bending radius.
- 04
Record
As-built locations recorded for owners and utilities.
FAQ
Utility Distribution & Underground questions
Do you coordinate with the serving utility?
Yes. We coordinate service requirements, equipment pads and scheduling with the utility on behalf of the owner or GC.
Do you handle both low- and medium-voltage underground work?
Yes, our underground work supports low-voltage, communications and medium-voltage systems.
Whatever It Takes
Inviting bids for an upcoming project?
Office hours Monday–Friday, 7:00 am – 4:00 pm. We aim to respond within 24 hours on business days.